Construction of a premium residential complex on Cabo Roiga beach, Orihuela Costa, Alicante

"ARCOSTEC - Architecture & Engineering" successfully continues the construction of a premium residential complex consisting of two houses (main and guest house) with a total living area of 1350 m2 and an outdoor swimming pool, in the urbanization of Cabo Roig on the Mediterranean coast, southern Costa Blanca, Orihuela city, Alicante province in Spain. We are summing up the first results of construction after the work was completed over the past two quarters. The following stages have been completed: 1 - Demolition, 2 - Groundwork, 3 - Foundation and 4 - Supporting structure of the main house. We would like to proudly note that all work was completed in line according to the customer’s layout. There were also no deviations from the construction estimate. Professionals of the company "ARCOSTEC" will continue to inform about the progress of construction work until its completion, which is planned for December 2016.

Construction of a residential complex in Spain

Demolition and dismantling

After obtaining all the necessary municipal licenses and permits, work began at the end of November 2015. The demolition of the existing house and pool was carried out, as well as the clearing of a site with an area of \u200b\u200b2000 m2

Earth work and excavation

After completing the first stage of construction, we began excavation and excavation work. Work began in December 2015. Despite the fact that the soil in this area turned out to be solid rock, this stage of construction was completed on time.

Foundation and reinforced concrete walls of the basement

After the completion of the excavation stage, we began to work on the foundation in the form of a monolithic slab and the basement walls. Composition of load-bearing elements made of reinforced concrete. Start of construction work in January 2016

Load-bearing frame and reinforced concrete structure

The start of work on the construction of the load-bearing frame and reinforced concrete structure with elements of steel profiles in February 2016. Formwork using wooden metal auxiliary structures.

Video of the construction process of a residential complex in Spain

01.11.2015 - 01.12.2015

01.12.2015 - 01.02.2016

Other articles

Insulate your home to protect it from heat, cold and noise.
If you want to protect your home from heat, cold and outside noise, the best idea is to insulate your home. Not only will we achieve a better quality of life inside the home if it remains insulated from outside noise, but good insulation will also m...
6 August 2021 | Строительство
Civil and Public Constructions
DIFFERENCE BETWEEN CIVIL AND PUBLIC CONSTRUCTION The truth is that there is a very narrow line between civil and public works and, in fact, there are certain works that are both civil and public at the same time. How can we learn to differentiate be...
25 June 2021 | Строительство
MODULAR HOMES
A modular house is one that comes completely finished from the workshop and is assembled on-site by joining modules together. They are complete and finished units that fit together like a puzzle. This is very difficult to achieve in practice since a...
12 November 2021 | Строительство