29_Реконструкция-виллы-в-Чапаррале_Ampliación-de-vivienda-en-Chaparral-4

29_Реконструкция-виллы-в-Чапаррале_Ampliación-de-vivienda-en-Chaparral-5

29_Реконструкция-виллы-в-Чапаррале_Ampliación-de-vivienda-en-Chaparral-8

29_Реконструкция-виллы-в-Чапаррале_Ampliación-de-vivienda-en-Chaparral-7

29_Реконструкция-виллы-в-Чапаррале_Ampliación-de-vivienda-en-Chaparral-11

29_Реконструкция-виллы-в-Чапаррале_Ampliación-de-vivienda-en-Chaparral-10

29_Реконструкция-виллы-в-Чапаррале_Ampliación-de-vivienda-en-Chaparral-9

29_Реконструкция-виллы-в-Чапаррале_Ampliación-de-vivienda-en-Chaparral-14

29_Реконструкция-виллы-в-Чапаррале_Ampliación-de-vivienda-en-Chaparral-13

29_Реконструкция-виллы-в-Чапаррале_Ampliación-de-vivienda-en-Chaparral-12

29_Реконструкция-виллы-в-Чапаррале_Ampliación-de-vivienda-en-Chaparral-6

29_Реконструкция-виллы-в-Чапаррале_Ampliación-de-vivienda-en-Chaparral-3

29_Реконструкция-виллы-в-Чапаррале_Ampliación-de-vivienda-en-Chaparral-2

29_Реконструкция-виллы-в-Чапаррале_Ampliación-de-vivienda-en-Chaparral-1

BRIEF SUMMARY

Project to extend a single family townhouse with pool in the urbanization “El Chaparral” of Torrevieja. ARCOSTEC professionals has been responsible for architectural design, processing of municipal license and construction process. In this case the budget was reasonably tight and had to adjust spending in all items of the work. Finally the result speaks for itself, a renovated house with large garden for the use and enjoyment of its members.

One bedroom has been extended and changed use from bedroom to garage. Being a large family, the developer needed two additional stays, that after the proposals made by the designers of ARCOSTEC have been able to fit without adversely affecting the interior layout of the existing house.

There is also provided a solar energy for hot water DHW, and has replaced the entire electrical installation.

As finishes; inside floor of the house is made of ceramic tiles, walls with plaster projected with gotelé surface and finish the plastic paint. Sanitary and new taps.

The deadline for execution of the work was four months, after the submission of the project execution in the municipality of Torrevieja.

CONSTRUCTION PROCESS
CONDITIONS & DISCLAIMER

Total or partial reproduction of the images of this website, regardless of the use they are intended, without the explicit consent of authors and professionals from “ARCOSTEC – Architecture & Engineering” is prohibited

The realization of architectural projects that use all or part designs and computer graphics that are displayed on this site without the explicit consent of authors and professionals “- Architecture & Engineering ARCOSTEC” is prohibited.

The images and visualizations of projects, both exterior and interior, are virtual recreations, whose functions are purely indicative. “ARCOSTEC – Architecture & Engineering” accepts no responsibility for the interpretation of these images.