Spectacular project of a modern villa optimized to the maximum, both in use of surfaces, as in its functionalities. It has a total area of 236.92 m², distributed over three habitable floors (Basement + Ground Floor + Upper Floor), with large open terraces, balconies and a covered solarium with access for all users of the house. It has an interior useful area of 135.07 m² and a total constructed area of 171.30 m². It has been designed taking care of every detail to the maximum, with landscape integration and south orientation with respect to a plot of quite small dimensions. Finally, it has an “infinity” type outdoor pool measuring 6.50 x 3.50 m (length x width) and 19.50 m² of water surface.


Year: 2020
Plot area: 330 m²
Total area: 237 m²
Building area: 171 m²
Bedrooms: 3 + 3 living rooms
Bathrooms: 2
Swimming pool: 6,50 x 3,00 m
Price: 6.500 €
Bearing in mind its characteristics, spaces and distribution, we can affirm that a perfect fit has been achieved within a plot of almost square geometry. Due to the small area of the plot, only 330 m², a semi-basement has been designed with natural lighting and ventilation, which does not compute at an urban level, leaving more than 250 m² free for the use and enjoyment, among natural grass, landscaped areas and porcelain floors. Finally, it has a parking area and design portal area for access.


Ideal home for the whole family, efficient and according to the latest requirements of the Technical Building Code CTE of Spain, as well as the Valencian Community Regulations. With efficient climate and heat recovery facilities, ventilation in all rooms, high-quality carpentry and top-of-the-range finishes. Following recent changes in legislation, a thermal insulation has been chosen for the exterior of the facade, called the “Sate” system, thus achieving an energy efficiency label with the best rating – CLASS A. We show you the commercial plans with distribution floors and elevations:
There are many ways to carry out an architectural project of a single-family home and each professional has their own system and way of working. We bet on the definition of every detail, both aesthetic and functional. For this reason, each project begins with a preliminary project, in which all the developer’s needs are defined according to their requirements, economic possibilities or simply tastes.
We attach great importance to this initial phase, since these preliminary works help to really define the importance of each singular project and reduce possible future economic and temporary unforeseen events. As a justification for the above, we show you the infographics and 3D render of the preliminary project phase of this particular house:
An architectural result achieved, housing with large spaces, making the most of the maximum surface area allowed and natural lighting. Even in the basement there are windows, which gives a touch of additional spaciousness to a space that was originally “condemned” to be a basement. Below you can consult the general data and content of the project:
- General style: Modern – HiTECH
- Basic project drafting deadline: 2 weeks
- Deadline for drafting project execution: 1 month
- Total habitable floors: 3 Plantas
- Plot area: 330 m²
- Useful living area: 135,07 m²
- Constructed area: 171,30 m²
- Exterior terrace area: 90,68 m²
Exterior measurements: 9,00 x 8,30 m
Flat roof: Not passable
- Level of qualities and finishes: High
- Total area: 236,92 m²
- Free height between floors: more than 2,70 m
- Maximum height: 8,00 m
- Large ground floor terrace: YES – in front of the pool
- Terrace – solarium: NO
- Total bedrooms: 3 bedrooms with possibility to make 2 more
- Other rooms: 2 living rooms + american kitchen
- Total bathrooms: 2 bathrooms + 1 optional
- Additional rooms: 1 pantry + hall + corridors
- Service areas: terrace facilities
- Climatized pool “infinity”: 6,50 x 3,00 m
Before starting to project any property, a prior study of the applicable current regulations and the minimum and maximum urban conditions and parameters to be met, such as buildability, occupation, setbacks, maximum height, etc. is required. These values are conditioned by the plot and the municipality in which it is located. These procedures are included in the price. This is usually 5% of the total budget for architect fees.
Having clear and verified the urban parameters of the plot, first sketches and distribution proposals are made based on the list of needs and demands of the developer. This is a very important phase, as all other phases of the project and its development and detailed definition depend on what the promoter confirms. That is why, in many cases, this stage is the slowest and most difficult to fit in, as clients are often indecisive and have a hard time making one decision or the other. A good initial fit guarantees economic savings and avoids delays due to modifications in the later stages of the project. The architectural blueprint is included in the price. As a general rule, its cost is 10% of the total architect’s fees.
Once the distribution and the main idea of the project have been established, the basic project is drawn up, whose mission is to justify compliance with the applicable regulations required by the town hall in which the house is to be built. The content of this project is as follows: descriptive memory + general plans of the property (situation and location, floor plans with dimensions and surfaces, elevations and bounded sections). In order to advance the waiting periods for the granting of a municipal license for new construction, this project is sufficient to process the license application by presenting it to the town hall and paying the corresponding ICIO and works fees. For this it is not mandatory that it be endorsed by the association of architects. This project is included in the price. Its cost is 20% of the total architect’s fees.
It is the phase of each project in which the constrictive solutions are detailed, the facilities are justified with their corresponding calculations, in addition to the foundation and structure. It is the part in which the finishes and all the materials are really defined, in addition to the extensive memory and in many cases difficult to understand by a person not familiar with the technicalities of the trade. In addition, it is the phase in which all the items to be made are measured with decomposed prices, a very important point in case you want to request estimates in several companies for the work and be able to make coherent and objective comparisons. The content of the execution project (which is neither more nor less the development and continuation of the basic project) is as follows: Constructive report + Justification of the Technical Building Code (CTE) + Specifications + Detailed measurements by chapters and items + Plans (In addition to those of the basic project are: calculation of foundations and structure + exterior and interior carpentry + construction details + calculation of facilities + equipment). For the granting of a municipal building license, it is necessary to present this phase of the project to the town hall. This project is included in the price. Its cost is usually around 30-40% of the architect’s total fees.
This is the part of the project in which the exterior cladding and fit on the plot are brought to the highest definition level through 3D infographics and high-quality rendering. This content is not compulsory, moreover, many architecture firms do not offer this service and hire professionals specialized in infographic architecture. We do include it in the price, we think that it is essential that a promoter of the works see the final result before disbursing large amounts doing work and thus be able to change coatings or facades at the project level and not during the work. This service is included in the price and its cost is included in the Execution project.
The interior of the rooms with its detailed design and enrichment of the spaces with accessories is a very important and essential task for the well-being of each client and owner of their future home. This project includes all those details that for various reasons are outside the execution project. In addition, it is not only about making the infographics and high quality 3D rendering, it is about the fact that the drawn models exist and can be purchased. That is why it is important to pay maximum attention to these aspects if you want to make an individual design. The search for furniture, accessories and equipment is carried out by asking for their prices and selecting the best offer. This service is not included in the price due to its peculiarity and prior ignorance of the needs of each client. What we can assure you is that we are able to offer the best budget and the tightest deadlines, ask us for the budget without any kind of commitment.
Until now, it was the “theoretical” part of the project. The architect is the author, but in order to carry out the work according to the architectural project drawn up and approved, a “Construction Director” must be appointed. It may be the same architect who created the project or it could be another architect, only in charge of the construction management. This is because the project can be written by a professional without being able to visit the work physically, either because of its location or because of any other argument. The cost of construction management is usually set between 20 and 30% of the total architect’s fees. This cost is not included in the price of the project.
Direction of Material Execution of the work is the mission attributed to the Technical Architect or Building Engineer, who together with the architect form the Facultative Directorate (D.F.), which is responsible for the correct execution of the work according to the drafted project. The Technical Architect, also called Quantity Surveyor, is the one who actually goes to the work to review, make important decisions and verify the correct execution of it. Their participation and importance in each project is set at 40% approx. with respect to the construction manager and lasts as long as the construction site itself. The material execution director’s fees are not included in the price of the project, but are usually between 30 and 50% of the architect’s fees, depending on the complexity of each work and its duration.
Once the work is finished and in order for it to be registered as such, both the Architect (direct of the work) and the Technical Architect (director of material execution of the work) issue their “Final Work Certificate” (C.F.O.). In total there are two certificates, one per professional. This document is necessary to modify any type of deed or other official document of the modified property or plot. Moreover, without these documents, it is not possible to finalize the work or request the return of municipal guarantees. Finally, it is the document that gives guarantees of the work actually executed, verifies responsibilities and allows the home to be registered in the cadastre using form 902. The cost of these certificates is not included in the price of the project, but it can cost up to 5 % of the total fees of each member of the Facultative Directorate (Architect + Surveyor in this case).
Apart from the services and parts of the project described above, some of the professional services not performed by the Project Management (Architect + Technical Architect) described below are necessary and / or mandatory: Topographic survey + Geotechnical Study + Steel and concrete laboratory + Service tests + Energy Efficiency Audit + Acoustic Audit (if applicable) + Management and processing of building licenses. The cost of these services is not included in the price of the project. For the assessment or estimate of these expenses, ask us for a budget without any kind of commitment.
If you liked this project carried out by our company together with the professional collaborators of reference, you have the opportunity to acquire it saving time and expenses, for only € 14,500 (VAT, according to Law, NOT included). It is much less than what a custom project made from scratch can cost you. See this project in process and terminated.
It admits making non-essential changes, as well as elimination of the basement (change for a sanitary floor). Don’t miss your chance and take advantage of the best offer now. If for any reason it is not the project you are looking for or does not meet your needs, ask us for a quote for an individualized project made to measure and we will prepare it in 24 hours.
Carrying out architectural and engineering projects, installations, construction solutions, municipal licensing procedures and management, technical reports and certificates, new construction and renovations, measurements and budgets. We work throughout the national territory. We are in Torrevieja, province of Alicante. Works and economic viability studies, investment projects and works management. Contact professionals – “Arcostec Group”.